2024: CO2 system is installed successfully, and data collection is ongoing, only with minor temperature logging problems.
2025 March: some problems with power cut off, which needs to be solved.
2025 October: Biofouling causing some downtime, currently establishing NRT data transfer.
Pierrot, D., Neill, C., Sullivan, K., Castle, R., Wanninkhof, R.H., Lüger, H., Johannessen, T., Olsen, A., Feely, R.A., Cosca, C.E., 2009. Recommendations for autonomous underway pCO2 measuring systems and data-reduction routines. Deep Sea Res. Part II Top. Stud. Oceanogr. 56, 512–522. https://doi.org/10.1016/j.dsr2.2008.12.005