2022 January: The new R/V Belgica is operational.
2024 October: The pCO2 and pH instrumentation was up and running during the first two months of 2024. In June, the operator of the RV Belgica unilaterally stopped the contract, and since then the ship has been at quayside. Hopefully, this will be solved soon. In the meantime no data collection is possible
meteorological parameters,air temperature, atmospheric pressure, wind speed, direct solar radiation, relative humidity
Sea-Bird, Aanderaa, Meinsberg
underway
Belgian Federal Government, Federal Science Policy
Contros
ROS
2016
http://meta.icos-cp.eu/resources/stations/OS_11BE
PI: Marc Knockaert, Co-PI: Koen Parmentier, Engineer: Tom Scholdis, Engineer: Nicky Jespers, Engineer: Nick Eloot, Data manager: Nicolas De Ville de Goyet