2025 October: The pCO2 instrumentation had to be removed in February 2025 due to change of ship route. The PIs have been looking for a new ship sice then.
2023-11-15T15:00:00Z
data provided every 15 days after visiting the ship at the Gran Canaria Port.
15 days.
STEP3APPROVED
-15.2470
28.0731
41.3627
2.1868
SBE 37, SBE45, oxygen optode 4835
Shower that balances the C02 in seawater with a head space gas that is analyzed